This 27.6 MW project for Vestas was characterized by the mechanical and electrical installation of eight V117 wind turbines, with an individual power of 3.45 MW each.
For Rui Fernandes, Project Manager, “raising the last blade was a source of great pride, especially as we were able to successfully achieve our objectives”.