Taltal Wind Farm

Built in the driest desert of the world.

Located on a remote area, at Atacama Desert, with adverse weather conditions and a tight planning to comply with, this wind farm placed strong logistics challenges. A well-planned procurement strategy, proper resources allocation and creation of onsite welfare facilities enabled the compliance with the works schedule and performance.

Project details
Client Enel Green Power
Area Balance of Plant (BoP), Power & Grid (EPC)
Location Antofagasta, Chile
Implementation time 226 days
Installed Power 99 MW
Power & Grid 220/33 kV Substation & Control Building
Wind Turbines 33 VESTAS V112 3.0 MW
Taltal Wind Farm 1
Taltal Wind Farm 2
Taltal Wind Farm 3
Taltal Wind Farm 4
What have we done

// Earth Movements

// 42 km of Access Roads & Ducts

// Cable Trenches

// 33 Foundations & Platforms

// 220/33 kV Substation & Control Building

// Internal Medium Voltage (MV) Network

// 220 kV Overhead High Voltage Line (OHVL) - 47 km

// Tap-off & 220 kV Interconnection Substation