CJR Renewables was responsible for the engineering, all the civil works, as well as the installation of 14,520 solar panels, support structure and other electrical equipment, as well as the execution of all the inherent works, such as trench opening, testing, commissioning and connection to the grid.

Located in various geographies in Poland, the projects involved more than 50 people in total, and at different stages.

Project details
Client R. Power
Area Balance of System (BoS)
Location Lubuskie Region, Province: Miedzyrzecz, Poland
Implementation time 121 days
Installed Power 4 MW
Solar Panels 14 520 Photovoltaic Modules (275 WP)
What have we done

// Engineering

// Foundations & Access Roads

// Installation of 14,520 solar panels (total)

// Support structures

// Commissioning & Connection to the Grid