Solar Cluster Poland

Cluster 8x1 MW installed in Poland 

CJR Renewables was responsible for the engineering, all the civil works, as well as the installation of 24,960 solar panels (total), support structure and other electrical equipment, as well as the execution of all the inherent works, such as trenching, testing, commissioning and grid connection. Located in various geographies in Poland, the projects involved more than 200 people in total, and at different stages.

Project details
Client R. Power
Area Balance of System (BoS)
Location Poland
Implementation time 165 days
Installed Power 8 MW
Solar Panels 2.968 PVs 335 WP
Solar Cluster Poland 0
Solar Cluster Poland 2
Solar Cluster Poland 3
Solar Cluster Poland 1
What have we done

// Engineering

// Foundations & Access Roads

// Installation of 24,960 solar panels (total)

// Support structures

// Commissioning & Network Connection