CJR Renewables installed (mechanically and electrically) 16 WTG VESTAS V112/3300 (power of 3300 kW and with a diameter of 112 m), representing a total power output of 52,8 MW. This was the first project of the company in the country, and despite all the logistics in an unknown market, CJR Renewables was able to conclude the project successfully.