Six wind turbines V126 3.6 MW were assembled in Marvila II Wind Farm, located near Fátima city (centre of Portugal).
This wind farm installation had an 8-week calendar, and a total output capacity of 21,6 MW. This project carried a special symbolism for being carried out “at home”, where this Business Unit was idealized.