Los Loros Utility-Scale PV Plant

Los Loros PV Plant was an ambitious project with a tight schedule.

Los Loros PV Plant was an ambitious project with a tight schedule that combined a special meteorological and geological condition due to the location in the Atacama Desert. CJR Renewables had a dynamic team, which positively overcame the challenge.

Project details
Client Isotron
Area Balance of System (BoS), Power & Grid (EPC)
Location Tierra Amarilla, Atacama, Chile
Implementation time 240 days
Installed Power 53 MW
Solar Panels 178.200 Crystalline Silicon Photovoltaic Panel 300 WP
Power & Grid Substation & Control Building
Los Loros Utility-Scale PV Plant 4
Los Loros Utility-Scale PV Plant 3
Los Loros Utility-Scale PV Plant 3
Los Loros Utility-Scale PV Plant 5
Los Loros Utility-Scale PV Plant 6
What have we done

// Earth Movements

// Access Roads & Ducts

// Cable Trenches

// Drainage

// Foundations & Platforms

// Substation & Control Building

// ITS Foundations

Share this project: