Kyaia was an ambitious project with a tight schedule, combining latest technology for carpark implementation, and rooftop particular conditions for structure assembly. CJR Renewables had a dynamic team allocated to the project, which favourably overcame the challenge.

Project details
Client Kyaia
Area Balance of System (BoS)
Location Guimarães, Portugal
Implementation time 30 days
Installed Power 0.25 MW
Solar Panels UP Solar 260 WP Poly
youtube
Kyaia Self-consumption PV Plant 0
Kyaia Self-consumption PV Plant 1
Kyaia Self-consumption PV Plant 3
What have we done

// Foundations

// Cable Trenches & Ducts

// Supply & Installation of Solar Panels

// Supply & Installation of Inverters

// Supply & Installation of Structures Monitoring System (rooftop & carpark)

// Tests, Commissioning & Grid Connection