One of the largest wind projects in Serbia.
During the construction phase, CJR Renewables was able to positively overcome every challenge, so that it even preceded the deadlines of the project. The energy produced will avoid more than 370.000 tons of carbon dioxide per year.
// Preliminary & Detailed Design (Civil/Electrical Infrastructure)
// Earth Movements
// 58 km of Access Roads
// 57 Foundations & Platforms
// 56 km of Cable Trenches
// Earthing Systems