Cybuk Wind Farm

One of the largest wind projects in Serbia.

During the construction phase, CJR Renewables was able to positively overcome every challenge, so that it even preceded the deadlines of the project. The energy produced will avoid more than 370.000 tons of carbon dioxide per year.

Project details
Client GE
Area Balance of Plant (BoP)
Location Vojvodina, Serbia
Implementation time 361 days
Installed Power 158 MW
Wind Turbines 57 GE 2,78 MW
Cybuk 1
Cybuk 2
Cybuk 3
What have we done

// Preliminary & Detailed Design (Civil/Electrical Infrastructure)

// Earth Movements

// 58 km of Access Roads

// 57 Foundations & Platforms

// 56 km of Cable Trenches

// Earthing Systems