my cart
Cart is currently empty
Total
17 mar 2022

CJR Renewables closed its first contract with Acciona, in Peru, to build the 131.1 MW San Juan de Marcona wind farm

A CJR Renewables fecha contrato com a Acciona Energy para a construção do parque eólico de San Juan de Marcona, de 131

Located in the municipality of Marcona, in the province of Nazca (Region of Ica), the San Juan de Marcona wind farm has CJR Renewables for the execution of the EPC (Engineering, Procurement and Construction).

The San Juan de Marcona Wind Farm consists of 23 Nordex N163 wind turbines, of 5.7 MW, where CJR Renewables is responsible for engineering, civil works (22 km of accesses, 23 platforms and foundations) and electrical works (93 km of medium voltage networks (33kV) and 14 km of cable trenches).

For Nuno Carvalho, Regional Manager, “We are proud to receive this vote of confidence from Acciona Energy, in this region. This project relies on our experience in the country, strengthening our position as the leading company in the Peruvian market. It is a challenging project, with a special focus on local development and strengthening community relationships. We are sure that it will be another success; we will contribute both to the development of the local economy and to a change in the country's energy matrix.”

The project is scheduled to end in 2023, with the San Juan de Marcona Wind Farm running in parallel with the Wayra II Wind Farm.

 

Share this news: