Aurora Wind Farm

The biggest project in Los Lagos region.

Located in a beautiful part of Chile, but simultaneously a difficult zone to work in construction, as precipitation is constant throughout the year, the Aurora project represented another milestone for CJR Renewables. By engaging a workforce of 250 workers daily, CJR Renewables performed all the works in record time, with quality and commitment. This wind farm will reduce 172 thousand tons of CO2 annually, which represents approximately 140 thousand cars withdrawn from use.

Project details
Client Mainstream Renewable Power
Area Balance of Plant (BoP), Power & Grid (EPC)
Location Los Lagos, Chile
Implementation time 344 days
Installed Power 129 MW
Power & Grid 220/33 kV Substation & Control Building
Wind Turbines 43 SENVION 3.0 M122
youtube
Aurora Wind Farm 5
Aurora Wind Farm 4
Aurora Wind Farm 5
What have we done

// Earth Movements

// 39 km of Access Roads & Ducts

// 38,5 km of Cable Trenches

// 43 Foundations & Platforms

// 220/33 kV Substation & Control Building

// Overhead High Voltage Line (0,3 km)

// Earthing Network System

// Medium Voltage (MV) & Communication Cables

// Tap-Off 220 kV

Share this project:
Power & Grid (EPC) Projects
0 MW implemented around the world