Project Details
Client
ENEL GREEN POWER
Scope
Balance of Plant (BoP), 220/30kV 105MVA Substation, 220kV OHVL, Tap-off & 220 kV Interconnection Substation
Localization
Taltal, Antofagasta - Chile
Implementation Time
226 Days
installed power
99 MW
Challenges //
Solutions
Located on a remote area, at Atacama Desert, with adverse weather conditions and a tight planning to comply with, this wind farm placed strong logistics challenges. A well planned procurement strategy, proper resources allocation and creation of onsite welfare facilities enabled the compliance with the works schedule and performance.
Project
Characteristics
Wind Turbines
33 VESTAS V112 3.0MW
Hub Height
80 meters
Rotor Diameter
112 meters
What we did
BALANCE OF PLANT (BoP)

  • Construction of roads
  • Foundations
  • Hardstands
  • 220/30kV 105MVA Substation
  • 220kV OHVL
  • Tap-off & 220 kV Interconnection Substation