Project Details
Client
EDP Renewables
Scope
Balance of Plant (BoP)
Localization
Albesti, Vaslui - Romania
Implementation Time
120 Days
installed power
28 MW
Challenges //
Solutions
In this case the biggest challenge was the tight schedule. A working day included only 4 hours during almost all project stages.

To work on the piles, two teams were established. All concrete pouring works were performed during night in order to comply with the project schedule.
Project
Characteristics
Wind Turbines
14 Vestas V90 (2,0 MW) WTG
Hub Height
105 meters
Rotor Diameter
90 meters
What we did
BALANCE OF PLANT (BoP)

  • Construction of roads 8km
  • 4632m of piles with 1m of diameter
  • Foundations
  • Hardstands
  • 10600m of trenches