Project Details
Client
WF Korytnica Sp. Zoo
Scope
BALANCE OF PLANT (BoP)
Localization
Masovian Province, Poland
Implementation Time
275 Days
installed power
82,5 MW
Challenges //
Solutions
A rainy weather allied with a soil of poor leakage were the major problems felt in this project, forcing CJR Renewables teams to do extra works to comply with the planning defined, that already was challenging. The experienced CJR Wind team was up to it, and with a perfect time management, as well as efficient management of resources and suppliers comply with the set schedule, and finish the project with maximum quality.
Project
Characteristics
Wind Turbines
VESTAS V126 3.3 MW
Hub Height
117/137 meters
Rotor Diameter
126 meters
What we did
  • Acess Roads (27 km)
  • WTG Foundations
  • Plataforms
  • 42 km Cable Trenches
  • 200 km of Cable Laying