Project Details
Client
PGE Energia Odnawialna SA
Scope
Balance of Plant (BoP
Localization
Pomorskie Voivodeship, District Lebork, Poland
Implementation Time
490 Days
installed power
90 MW
Challenges //
Solutions
Works were performed during winter time without breaks and extreme weather conditions. Seventy percent of the UGHVL was built on the slope of a deactivated railway passing on forest areas and on places with a high phreatic level. A total of 4 km of horizontal direct drillings were executed in order to UG avoid trees cutting and underground infrastructures damage.
Project
Characteristics
Wind Turbines
Alstom ECO 110 3 MW Class II-A HH90
Hub Height
90 meters
Rotor Diameter
110 meters
What we did
BALANCE OF PLANT (BoP)

  • Construction of roads
  • 30 WTG Foundations
  • Hardstands
  • Electrical Substation 110/30 kV
  • Internal MV Network
  • 110 kV UGHVL (2 lines) with length 38 km 