Project Details
Client
Vestas
Scope
Localization
Lebu, Arauco, Chile
Implementation Time
190 Days
installed power
15 MW
Challenges //
Solutions
This wind farm was build facing adverse weather conditions, especially because the project start in winter. The sandy soil represent a challenge for CJR Renewables Team, which had to find alternatives to do a proper implementation of the project.
Project
Characteristics
Wind Turbines
Vestas V112 3.0 MW
Hub Height
84 meters
Rotor Diameter
112 meters
What we did
Balance of Plant (BoP)

  • Construction of roads
  • Foundations
  • Foundations soil improvement with 10 kilometers of rammed aggregate pier)
  • Handstands
  • Medium Voltage Network
  • Switchstation  23 kV
  • MV Overhead Line