Project Details
Client
EDP Renewables Portugal
Scope
Balance of Plant (BoP) & Wind Turbine Installation
Localization
Tocha, Figueira da Foz - Portugal
Implementation Time
120 Days
installed power
9 MW
Challenges //
Solutions
This wind farm was constructed on the Portuguese coast, on a terrain mostly formed by sand.

CJR Wind had to comply with a tight schedule, high customer standards regarding Control & Protection System. The focus was heavily placed on supply chain management, guaranteeing that all key suppliers would be able to meet the project schedule, complying with the agreed grid connection date. The soil high earth resistivity led to particular technical solutions in order to reach values of earth resistance above 1 ohm, in compliance with applicable standards.
Project
Characteristics
Wind Turbines
5 Vestas V100 (1,8 MW)
Hub Height
105 meters
Rotor Diameter
100 meters
What we did
BALANCE OF PLANT (BoP)

  • Construction of roads
  • Foundations
  • Hardstands
  • Construction of a 15KV Switch Station
  • Internal Medium Voltage Network
  • Connection to 15 kV line
  • WTGs Mechanical & Electrical Installation